What moves the number · three scopes · free line-by-line estimate

Bathroom remodel cost in New Jersey — what moves the number, and how to get yours

A bathroom estimate has five lines that matter: the shower, the tile and its setting, the vanity and top, the fixtures, and the trade work. This page explains each, the three scopes we price most, where the value is, and how to get a free line-by-line number for your bath the same visit.

4.9 337 Google reviews · Union 4.8 119 Google reviews · Paramus50+ full kitchens on displayFree 3D design & estimateOur own installation crewSince 2013 · 3 showrooms
EstimateFree · line by line · same visit
Biggest linesTiled shower · tile setting · vanity
ScopesRefresh · remodel · full gut
Vanities38 models on the floor; custom from the cabinet lines
TileFive partners, boards in the showroom
Timeline1–3 weeks on site
FinancingNone — we sell direct
ShowroomsUnion · Paramus · Rochelle Park

The lines on a bathroom estimate

LineWhat moves itWeight
ShowerPrefabricated base and surround, or a tiled shower with a mosaic floor, a bench, a niche, a glass door; curbless where the floor allowsUsually the largest line in a full bath
Tile and settingFloor and wall square footage, the tile itself (porcelain to marble), mosaics, patterns, large formats, waterproofingLarge; labour-heavy
Vanity and topA stocked Otto Home Goods or Blossom vanity with an integrated top, or a custom vanity from the kitchen lines with a slab topMedium; custom adds a cabinet lead time
Fixtures and lightingFaucet, shower valve and trim, toilet, tub, mirrors, medicine cabinets, sconces, fanMedium; the finish level sets it
Trade workMoving the toilet or the shower drain, new circuits, exhaust, permitsFrom nothing to a major line in a gut

Three scopes

  • Refresh. New vanity, top, faucet, mirror and floor tile in the existing layout; the shower stays. About a week.
  • Remodel. Same footprint, everything new: tiled shower, vanity, tile floor and walls, fixtures, lighting. One to three weeks — the Cranford bath with its Timber double vanity, the maple floating vanity under arched mirrors.
  • Full gut. The layout changes — a tub becomes a shower, the toilet moves, a wall comes out — with the plumbing and electrical to match: the Room Therapy primary bath with its marble shower bench and freestanding tub, the whole-home baths in Montclair and at the Mount Arlington lake house.

Where the value is

  • A stocked vanity with an integrated top is the fastest and least expensive way to a finished look; a custom vanity from the kitchen line is for matching or odd walls.
  • Run one porcelain on the floor and the shower walls; spend the tile money on the mosaic floor, the niche and one feature wall.
  • Keep the drains where they are unless the layout truly fails; moving a toilet is the most expensive foot in the house.
  • Choose the shower glass and the fixtures with the tile — finish mismatches cost more to fix than to avoid.

Getting your number

Bring the room dimensions, the vanity wall measurement and photos. A designer lays out the bath, pulls the vanity, the tile boards and the top beside each other, and prices the whole room line by line — vanity, top, tile, shower, fixtures, installation and trade work — the same visit. See bathroom remodeling for how the job runs and the vanity buying guide for sizes and materials.

Installed

Baths we have remodeled

Next step

See it on a sample door, beside the slabs.

Book a showroom visit and a designer will have the doors, finishes and countertops you are reading about pulled and ready — or compare them on a video call first.

Good to know

Questions we get

How much does a bathroom remodel cost in New Jersey?
It depends on the scope — a vanity and tile refresh, a full remodel in the same footprint, or a gut with the layout changed — then on the vanity (stocked or custom), the tile, the shower (prefabricated base or tiled with a bench and niche) and the fixtures. Our estimate lists each line, free, after a layout.
What costs the most in a bathroom?
Labour and trade work usually lead — tile setting, plumbing and waterproofing are hours — followed by the tile and the vanity. A tiled shower with a bench and a niche is the single biggest line in most baths.
Is a vanity-and-tile refresh worth doing?
It is the best value in the house: a new vanity, top, mirror, faucet and floor tile in the existing layout changes the room for a fraction of a gut, in a week.
Do you handle the plumbing and the permit?
Yes — plumbing and electrical coordination are lines on the estimate; we tell you if your scope needs a permit and schedule the inspections.
Do you offer financing?
No. We sell direct and keep the price low.
How do I get a price?
Bring the wall measurement, the room dimensions and photos; a designer lays out the bath, pulls the vanity, tile and top beside each other, and prices it line by line, free.

See it in the showroom before you buy it.

Union · Route 22 East, Paramus · Route 17 N and Rochelle Park · Route 17 S. Walk in any day, or book a time and we'll have the displays pulled for you.

Free 3D design

Tell us about the room.

Send this and a designer will call within one business day to arrange a showroom visit or a measurement. No obligation.

Or send the details and we'll call you

No fee, no obligation. Prefer to talk? Union 908-258-8774 · Paramus 201-262-9000 · Rochelle Park 551-306-0606. Walk-ins welcome at all three showrooms.
Thank you.A designer will call within one business day. In a hurry? Union 908-258-8774 · Paramus 201-262-9000.
CallFree designBook a visit
Ready when you areBook an appointmentFree 3D designCall